Specus
village/09_FINANCE/CAPEX_OPEX_Categories.md
CAPEX And OPEX Categories
Скачать .mdСкачать папку .zip

CAPEX And OPEX Categories

CAPEX

  • land acquisition or lease premium
  • legal due diligence
  • permits and licensing
  • design and engineering
  • masterplan
  • housing units
  • standalone home package
  • delivery
  • installation
  • foundations or groundworks
  • site preparation
  • utility hookups
  • partner manufacturer deposits
  • customs and import duties
  • roads
  • road widening reserve
  • paths
  • parking
  • drainage / stormwater
  • water system
  • water storage
  • water testing
  • wastewater system
  • septic / treatment feasibility
  • power system
  • backup generator or batteries
  • internet and low-voltage
  • underground conduits for future phases
  • emergency communication system
  • emergency access road requirements
  • emergency hub
  • fire water tank / hydrant feasibility
  • backup storage
  • protected utility room
  • shelter feasibility study
  • shelter engineering / certification where relevant
  • common buildings
  • reception
  • dining / cafe
  • coworking
  • wellness
  • staff and service areas
  • furniture, fixtures, equipment
  • landscape
  • gardens and greenhouse setup
  • high tunnels / protected growing
  • irrigation
  • wash-pack area
  • cool storage
  • animal shelters and fencing
  • apiary setup
  • chicken housing and predator protection
  • food processing / storage equipment only where legally allowed
  • owner produce packing area
  • dairy / cheese facilities only as later professional business case
  • owner-ready renovation reserve
  • fire safety
  • pre-opening marketing
  • contingency

OPEX

  • payroll
  • housekeeping
  • maintenance
  • rental operations
  • utilities
  • internet
  • insurance
  • land lease
  • taxes
  • marketing
  • OTA commissions
  • booking systems
  • CRM
  • laundry
  • guest supplies
  • food and beverage cost
  • seeds, seedlings and fertility
  • feed and bedding
  • veterinary care
  • food safety inspections
  • product liability insurance
  • packaging and labels
  • cold storage electricity
  • farm labour
  • agriculture labor
  • animal feed and veterinary costs
  • food packaging
  • product delivery / shipping
  • sanitary compliance
  • repairs and replacements
  • rental wear reserve
  • owner-ready conversion work
  • waste management
  • septic pumping / wastewater operator
  • water testing and maintenance
  • road grading and drainage maintenance
  • security
  • emergency drills and readiness reviews
  • emergency supplies rotation
  • warranty handling
  • aftersales coordination
  • partner management
  • accounting
  • legal
  • community and events

Required Percent Assumptions

Model:

  • design and professional fees: 5-10% of CAPEX
  • contingency: at least 10% of CAPEX
  • OTA commission: 10-20% of booking revenue where relevant