Location Selection Process
Скачать .mdСкачать папку .zip

Location Selection Process

Purpose

Select locations that can support a safe, autonomous, legally viable, and economically meaningful Specus Village.

Trigger

A new country, region, or land plot is proposed.

Owner

To be defined.

Core Rule

fatal flaws first, beauty second

Specus Village не выбирает землю только по красоте, цене или вайбу. Сначала нужно доказать, что участок юридически, физически и операционно выдерживает Village.

Process

1. Country / Region Screen

Before individual land plots, compare the country or region:

  • land tenure clarity;
  • foreign ownership / lease rules;
  • planning certainty;
  • rural road access;
  • power reliability;
  • internet backbone;
  • water regime;
  • wastewater regulation;
  • hazard data maturity;
  • healthcare and EMS baseline;
  • construction ecosystem;
  • tourism and demand context;
  • local supply-chain depth;
  • insurance and finance environment;
  • municipal and community culture.

2. Red-Flag Gate

Do not score a site until these red flags are checked:

  • unclear, disputed or non-transferable title;
  • missing legal access / easement;
  • zoning that clearly blocks the Village concept;
  • no legally secure water source;
  • no compliant wastewater route;
  • seasonally cut-off or construction-incompatible access;
  • buildable area in severe flood, erosion, landslide or wildfire exposure;
  • geotechnical conditions that make foundations, roads or utilities abnormal;
  • strong municipal or community opposition;
  • serious security environment;
  • no legal or physical path to later phases.

Unresolved red flag = hold / reject, regardless of visual appeal.

3. Weighted Scoring

Score every viable site from 0 to 5:

  • 5 — excellent; ordinary mitigation only;
  • 4 — good; manageable risk or cost premium;
  • 3 — conditional; viable with explicit mitigation, CAPEX and permit plan;
  • 2 — weak; serious constraint or uncertainty;
  • 1 — poor; only if strategically exceptional and cheap;
  • 0 — fail.

Use these weighted criteria:

CriterionWeight
Legal / zoning status6
Land ownership and use rights7
Access road4
Emergency access4
Distance to airport / city4
Medical access3
Water availability7
Wastewater feasibility6
Power3
Internet2
Climate comfort3
Natural hazards5
Fire risk4
Flood / drainage5
Soil and foundation conditions6
Construction logistics5
Local labour and suppliers4
Hospitality potential5
Food system potential4
Community / municipal acceptance5
Security4
Long-term scalability4

4. Evidence Confidence

Each score must have an evidence grade:

  • A — legal documents, licensed expert report, utility confirmation, official map or measured field data;
  • B — strong desktop evidence, provider letters, municipal discussions or credible secondary data;
  • C — visual impression, seller statement or unverified estimate.

Apply confidence multiplier:

  • mostly A: 1.00;
  • mixed A/B: 0.90;
  • mostly B/C: 0.80.

5. Decision Bands

Final ScoreDecision
85–100pursue immediately
70–84pursue conditionally
55–69reserve / watchlist
below 55do not pursue

Red flags override score.

Required A-Grade Evidence Before Sales

Do not market a site as a home plot, infrastructure package or full Village concept until these are A-grade:

  • legal control;
  • legal access;
  • water;
  • wastewater;
  • buildable area / hazard confirmation.

Location Archetypes

Near-Access Village

Best for residential sales.

Prioritise:

  • road reliability;
  • medical access;
  • utilities;
  • municipal acceptance.

Destination Village

Best for residential + hospitality.

Prioritise:

  • airport access;
  • destination appeal;
  • seasonality;
  • social licence.

Remote-Regenerative Village

Only pursue if water, food-system potential, hazard resilience and self-sufficiency are exceptional.

First Site Visit Checklist

  • Drive the full approach route in and out.
  • Record road surface, bridges, steep segments and difficult turns.
  • Test whether fire truck, ambulance, crane, module trailer and concrete truck could access.
  • Check low points for debris lines, ponding, erosion and blocked drainage.
  • Look for seasonal water signs.
  • Ask local people where the site floods, burns, loses power or becomes inaccessible.
  • Identify the real buildable terrace / plateau, not only gross land area.
  • Check nearby nuisance: odour, quarry, heavy traffic, noise, industrial use.
  • Run internet tests at several points.
  • Measure real travel time to clinic, emergency department, fuel, builders’ merchant and municipality.
  • Speak with planner, firefighter, road engineer, well driller and septic installer if possible.
  • Check whether phase two can expand without fatal legal or physical constraints.

Expert Checks

ExpertMinimum deliverable
Property lawyer / title specialisttitle review, encumbrance schedule, easement / access memo
Planning consultant / land-use lawyerplanning route memo, approvals schedule, red-line issues
Licensed surveyorboundary, topo and access survey
Hydrogeologist / water engineeryield, seasonality, quality and storage concept
Wastewater soil scientist / sanitary engineersite-and-soil evaluation, system options, regulator path
Geotechnical engineersoil / foundation report with risk zones
Civil / road / drainage engineeraccess feasibility, road upgrades, stormwater concept
Fire consultant / foresterfire-risk memo, egress, suppression-water and defensible-space plan
Flood / hydrology engineerflood and overland-flow assessment with build / no-build map
Modular logistics specialistroute survey, laydown and crane / assembly concept
Environmental / social consultantEIA trigger memo, stakeholder map, consultation plan
Market / hospitality analystdemand memo, seasonality and comparator set

Output

A location decision file in the relevant folder under 08_LOCATIONS.

Before a site can move forward, it must pass legal due diligence in 04_OPERATIONS/Business_Processes/Legal_Due_Diligence_Process.md.

Brand / Trust Use

The location framework is part of trust architecture:

Specus does not merely sell attractive land; it pre-qualifies village locations.